Celeste Marilyn
Celeste Marilyn is an operational data center operated by Celeste in Champs-sur-Marne, France. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Celeste |
| Facility power | 0.8 MW (range 0.3 MW to 2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,576 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Datacenter Marilyn |
| Address | 20 Rue Albert Einstein |
| Coordinates | 48.83522, 2.58775 |
| Website | marilyn-datacenter.com |
Power and grid
| Nearest high-voltage substation | Poste source Richardet, 225 kV, 500 m away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 16 |
| Power plants within 50 km | 2.2 GW in 51 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Celeste Marilyn use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Celeste Marilyn to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste source Richardet (225 kV), about 500 m away.
How clean is the power for Celeste Marilyn?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Celeste Marilyn?
Celeste.
Data centers near Champs-sur-Marne
- nLighten Paris PAR3 663 m · 1.5 MW
- Datacenter Banque de France 2.8 km · 7.3 MW
- nLighten France data center in Marne La Vallée 3.0 km · 3.7 MW
- nLighten Paris PAR1 3.1 km · 2.1 MW
- Euroclear data center in Bry-sur-Marne 3.8 km · 3 MW
- Penta Infra Paris PAR01 3.9 km · 5.1 MW
- APPLIWAVE - CBO 4.2 km
- BNP Paribas Marne Sud 4.5 km · 6 MW
More Celeste data centers
- Celeste Fil d’Ariane France
Sources
Correct this page or get the data