centron DC bbg
centron DC bbg is an operational data center operated by centron in Hallstadt, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | centron |
| Networks | 2 networks PeeringDB. |
| Address | Heganger 29 |
| Coordinates | 49.91359, 10.86509 |
| Website | centron.de |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 110 kV, 2.2 km away (Bayernwerk Netz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 380 kV, 2.6 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 291 MW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.7 °C (2001 to 2025) |
| Cooling degree days | 131 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.96 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is centron DC bbg to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (110 kV), about 2.2 km away.
How clean is the power for centron DC bbg?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates centron DC bbg?
centron.
Data centers near Hallstadt
- Stadtnetz Bamberg 2.0 km
- Data center in Eckersdorf 34.0 km
- SÜC Datacenter 1 38.4 km
- UNITED COLO GmbH / NGZ-Server.de Coburg 38.5 km
- FIS-ASP data center in Schweinfurt 48.2 km · 1 MW
- RegioNet Schweinfurt GmbH 48.8 km
- ADESTIS Nürnberg NBG1 (Alte Dampfbäckerei) 51.7 km
- euNetworks Colocation Nuernberg 51.9 km