Centurylink data center in Burbank is an operational data center operated by Centurylink in Burbank, United States. Our footprint estimate of its power is about 3.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Centurylink |
| Facility power | 3.7 MW (range 1.9 MW to 6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,123 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 1990 |
| Coordinates | 34.19987, -118.34379 |
Power and grid
| Nearest high-voltage substation | Receiving Station E - Toluca, 500 kV, 3.1 km away (Los Angeles Department of Water and Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Utility | City Of Burbank Water And Power (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | LDWP |
| Nearest gas pipeline | Southern California Gas Co, intrastate pipeline, 7.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 6.4 GW in 77 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 17.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.5 °C (2001 to 2025) |
| Cooling degree days | 530 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.65 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centurylink data center in Burbank use?
We estimate the facility power at about 3.7 MW. Estimate from building footprint, low confidence.
How close is Centurylink data center in Burbank to the power grid?
The nearest high-voltage substation in OpenStreetMap is Receiving Station E - Toluca (500 kV), about 3.1 km away. The local utility is City Of Burbank Water And Power, in the LDWP balancing area.
How clean is the power for Centurylink data center in Burbank?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Who operates Centurylink data center in Burbank?
Centurylink.
Data centers near Burbank
- Burbank Water and Power 3.5 km
- Fireline Data Center 15.4 km
- Xfernet LAX01 16.1 km
- The Garland Center / West 7 Center 18.0 km
- Equinix LA2 - Los Angeles 18.5 km
- MultaCom Main 18.6 km
- Psychz Networks LAX1 18.6 km
- Telehouse - Los Angeles 18.7 km
More Centurylink data centers
- CenturyLink United States
- Centurylink data center in El Segundo United States
- CenturyLink data center in Las Cruces United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.