CenturyLink
CenturyLink is an operational data center operated by CenturyLink in Salem, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CenturyLink |
| Facility power | 11 MW (range 5.3 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,376 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | State Street 740 |
| Coordinates | 44.93808, -123.03372 |
Power and grid
| Utility | Salem Electric (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | BPAT |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 11 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CenturyLink use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How clean is the power for CenturyLink?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates CenturyLink?
CenturyLink.
Data centers near Salem
- Oregon State Data Center 2.8 km · 6.7 MW
- PTC 37.6 km
- Sunbreak Electronics 45.6 km
- Peak Internet 46.2 km
- Siemens EDA - HDC / Data Center 47.3 km · 2.5 MW
- TGRDORXA - Tigard Central Office 58.1 km
- Digital Fortress (PTL2) 63.2 km
- BVTNORXB - Beaverton Central Office 63.8 km
More CenturyLink data centers
- Centurylink data center in El Segundo United States
- CenturyLink data center in Las Cruces United States
- Centurylink data center in Burbank United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.