Siemens EDA - HDC / Data Center
Siemens EDA - HDC / Data Center is an operational data center operated by Siemens Digital Industries Software in Wilsonville, United States. Our footprint estimate of its power is about 2.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Siemens Digital Industries Software |
| Facility power | 2.5 MW (range 1.3 MW to 4.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,121 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Southwest Parkway Avenue 27930, 97070, Wilsonville |
| Coordinates | 45.31872, -122.76588 |
Power and grid
| Nearest high-voltage substation | Wilsonville Substation, 115 kV, 100 m away (Portland General Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Pearl Substation, 500 kV, 1.5 km away |
| HV substations within 10 km | 9 |
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 16.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 972 MW in 70 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Siemens EDA - HDC / Data Center use?
We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.
How close is Siemens EDA - HDC / Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Wilsonville Substation (115 kV), about 100 m away. The local utility is Portland General Electric Co, in the PGE balancing area.
How clean is the power for Siemens EDA - HDC / Data Center?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates Siemens EDA - HDC / Data Center?
Siemens Digital Industries Software.
Data centers near Wilsonville
- Sunbreak Electronics 9.5 km
- TGRDORXA - Tigard Central Office 11.9 km
- Digital Fortress (PTL2) 17.5 km
- BVTNORXB - Beaverton Central Office 19.4 km
- Clackamas ESD Datacenter 19.8 km
- Digital Fortress (PTL) 23.5 km
- PTOR1 23.5 km · 12 MW
- Corepacket PDX-1 23.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.