Data Center Directory

China Unicom (Hong Kong) Global Center

China Unicom (Hong Kong) Global Center is an operational data center operated by China Unicom in Hong Kong, Hong Kong SAR China. No power figure is public for this site yet. Likely chips: Huawei Ascend and NVIDIA China-market GPUs (guess).

Key facts

StatusOperational
OperatorChina Unicom
AI chipsHuawei Ascend and NVIDIA China-market GPUs
Guess from the operator, not confirmed. Chinese operators use Huawei Ascend and export-limited NVIDIA chips.
Networks21 networks, 1 internet exchanges
PeeringDB.
Address19 Chun Wang St
Coordinates22.28335, 114.26924
Websitechinaunicomglobal.com

Power and grid

Nearest high-voltage substation將軍澳400仟伏變電站 Tseung Kwan O 400kV Substation, 400 kV, 5.4 km away (中華電力有限公司 CLP Power Hong Kong Limited)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
Power plants within 50 km23 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity673 g CO₂ per kWh (Hong Kong SAR China, 2024)
Average of all power made in the area. Ember.
Grid power mixgas 63.8%, coal 33.5%, oil and other fossil 1.2%, solar 1%. Clean power: 1.5%

Climate and water

Average temperature23.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.6 °C (2001 to 2025)
Cooling degree days2,112 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.14 kWh per m² per day
Wind at 50 m5.6 m/s average

Satellite view

Questions

What chips does China Unicom (Hong Kong) Global Center use?

No chips are reported. Based on the operator, the likely chips are Huawei Ascend and NVIDIA China-market GPUs.

How close is China Unicom (Hong Kong) Global Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is 將軍澳400仟伏變電站 Tseung Kwan O 400kV Substation (400 kV), about 5.4 km away.

How clean is the power for China Unicom (Hong Kong) Global Center?

The grid in Hong Kong SAR China emits about 673 g CO₂ per kWh (2024). Largest sources: gas 63.8%, coal 33.5%, oil and other fossil 1.2%.

Who operates China Unicom (Hong Kong) Global Center?

China Unicom.

Data centers near Hong Kong

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.