CloudHQ LC8
CloudHQ LC8 is a data center under construction operated by CloudHQ in Ashburn, United States. Its power is about 140 MW.
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | CloudHQ |
| Facility power | 140 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 108 MW |
| GPU capacity if all AI | about 60,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Loudoun County Parkway 22190, 20147, Ashburn |
| Coordinates | 39.00200, -77.46844 |
| Website | cloudhq.com/campus/lc-campus |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 1.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CloudHQ LC8 use?
Public data puts the facility power at about 140 MW. Derived from a tagged IT power value.
How clean is the power for CloudHQ LC8?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates CloudHQ LC8?
CloudHQ.
Data centers near Ashburn
- CloudHQ LC4 301 m · 234 MW
- QTS Ashburn (ASH3) 594 m
- Digital Realty IAD39 629 m · 125 MW
- QTS Ashburn-Shellhorn 672 m · 55 MW
- RC-Facility 722 m
- Amazon IAD-161 730 m · 27 MW
- Amazon IAD-285 734 m · 12 MW
- CloudHQ LC14 752 m · 140 MW
More CloudHQ data centers
- CloudHQ LC4 United States
- CloudHQ Ashburn Campus United States
- CloudHQ LC12 United States
- CloudHQ LC14 United States
- CloudHQ MCC2 United States
- CloudHQ MCC1 United States
- CloudHQ Germany
- CDG1 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.