CDG1
CDG1 is an operational data center operated by CloudHQ in Lisses, France. Our footprint estimate of its power is about 35 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CloudHQ |
| Facility power | 35 MW (range 17 MW to 56 MW) Estimate from building footprint, low confidence. Footprint estimate: about 29,018 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 2025 |
| Coordinates | 48.59678, 2.40914 |
Power and grid
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 152 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CDG1 use?
We estimate the facility power at about 35 MW. Estimate from building footprint, low confidence.
How clean is the power for CDG1?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates CDG1?
CloudHQ.
Data centers near Lisses
- Commissariat a l'Energie Atomique Topaze 3.4 km · 0.2 MW
- Datacenter Société Generale 8.6 km · 8.3 MW
- Datacenter Sirius 11.0 km · 14 MW
- Data4 Campus Paris Saclay 14.5 km · 84 MW
- data4 data center in Marcoussis 14.8 km · 10 MW
- data4 data center in Marcoussis 14.8 km · 5.9 MW
- Data4 Campus Nozay PAR3 14.9 km · 17 MW
- Datacenter Bouygues Télécom 15.0 km
More CloudHQ data centers
- CloudHQ LC4 United States
- CloudHQ Ashburn Campus United States
- CloudHQ LC12 United States
- CloudHQ LC14 United States
- CloudHQ LC8 United States
- CloudHQ MCC2 United States
- CloudHQ MCC1 United States
- CloudHQ Germany
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.