Commissariat a l'Energie Atomique Topaze
Commissariat a l'Energie Atomique Topaze is an operational AI data center operated by French Alternative Energies and Atomic Energy Commission (CEA) in Évry, France. Its power is about 0.2 MW. Epoch AI estimates about 61 H100-equivalent AI chips (NVIDIA A100).
Key facts
| Status | Operational |
|---|---|
| Operator | French Alternative Energies and Atomic Energy Commission (CEA) |
| Facility power | 0.2 MW Reported (Epoch AI or owner data) |
| AI compute | 61 H100-equivalents |
| AI chips | NVIDIA A100 Reported (Epoch AI or owner data) |
| Chip count | 192 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 70 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Essonne, France |
| Coordinates | 48.62417, 2.42897 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Coquibus, 225 kV, 900 m away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 2.3 GW in 49 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 152 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Commissariat a l'Energie Atomique Topaze | NVIDIA A100 | 192 | 0.2 MW | 2021-06-23 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Commissariat a l'Energie Atomique Topaze use?
Public data puts the facility power at about 0.2 MW. Reported (Epoch AI or owner data).
What chips does Commissariat a l'Energie Atomique Topaze use?
Reported chips: NVIDIA A100.
How close is Commissariat a l'Energie Atomique Topaze to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Coquibus (225 kV), about 900 m away.
How clean is the power for Commissariat a l'Energie Atomique Topaze?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Commissariat a l'Energie Atomique Topaze?
French Alternative Energies and Atomic Energy Commission (CEA).
Data centers near Évry
- CDG1 3.4 km · 35 MW
- Datacenter Société Generale 5.7 km · 8.3 MW
- Datacenter Sirius 9.1 km · 14 MW
- Datacenter Bouygues Télécom 11.7 km
- MEDIACTIVE MN3 14.4 km
- Data4 Campus Nozay PAR3 14.9 km · 17 MW
- Data4 Campus Paris Saclay 15.0 km · 84 MW
- Goodman PAR02 A&B Data Centre Campus 15.1 km · 19 MW
More French Alternative Energies and Atomic Energy Commission (CEA) data centers
- CEA EXA1-HE France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.