Data Center Directory

Goodman PAR02 A&B Data Centre Campus

Goodman PAR02 A&B Data Centre Campus is a data center under construction in Choisy-le-Roi, France. Our footprint estimate of its power is about 19 MW.

Key facts

StatusUnder construction
Facility power19 MW (range 7.7 MW to 48 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 160,603 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates48.75924, 2.44849

Power and grid

Nearest high-voltage substationPoste électrique de Villeneuve-Saint-Georges, 225 kV, 600 m away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km16
Power plants within 50 km2.0 GW in 53 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days130 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.19 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Goodman PAR02 A&B Data Centre Campus use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

How close is Goodman PAR02 A&B Data Centre Campus to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Villeneuve-Saint-Georges (225 kV), about 600 m away.

How clean is the power for Goodman PAR02 A&B Data Centre Campus?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Data centers near Choisy-le-Roi

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.