Goodman PAR02 A&B Data Centre Campus
Goodman PAR02 A&B Data Centre Campus is a data center under construction in Choisy-le-Roi, France. Our footprint estimate of its power is about 19 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 19 MW (range 7.7 MW to 48 MW) Estimate from building footprint, low confidence. Footprint estimate: about 160,603 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 8,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.75924, 2.44849 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Villeneuve-Saint-Georges, 225 kV, 600 m away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 16 |
| Power plants within 50 km | 2.0 GW in 53 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Goodman PAR02 A&B Data Centre Campus use?
We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.
How close is Goodman PAR02 A&B Data Centre Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Villeneuve-Saint-Georges (225 kV), about 600 m away.
How clean is the power for Goodman PAR02 A&B Data Centre Campus?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Data centers near Choisy-le-Roi
- MEDIACTIVE MN3 2.4 km
- Datacenter Bouygues Télécom 4.1 km
- OPCORE - DC2 / PAR2 4.8 km · 3.7 MW
- OPCORE - DC3 / PAR3 5.3 km · 16 MW
- Digital Realty Paris PAR6 7.1 km · 6.7 MW
- Aqua Ray Aurora 7.9 km
- COLT DC Paris III 9.2 km
- Acropolis Telecom Paris-Nation 9.9 km