OPCORE - DC3 / PAR3
OPCORE - DC3 / PAR3 is an operational data center operated by OPCORE in Vitry-sur-Seine, France. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | OPCORE |
| Facility power | 16 MW (range 7.8 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,934 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 26 networks, 4 internet exchanges PeeringDB. |
| Also known as | OPCORE DC3 |
| Address | 61 RUE JULIAN GRIMAU |
| Coordinates | 48.77528, 2.37997 |
| Website | opcore.com |
Power and grid
| Nearest high-voltage substation | Poste électrique de Chevilly, 225 kV, 1.1 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 37 |
| Power plants within 50 km | 2.0 GW in 53 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does OPCORE - DC3 / PAR3 use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
How close is OPCORE - DC3 / PAR3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Chevilly (225 kV), about 1.1 km away.
How clean is the power for OPCORE - DC3 / PAR3?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates OPCORE - DC3 / PAR3?
OPCORE.
Data centers near Vitry-sur-Seine
- OPCORE - DC2 / PAR2 3.2 km · 3.7 MW
- MEDIACTIVE MN3 3.6 km
- Digital Realty Paris PAR6 4.8 km · 6.7 MW
- Aqua Ray Aurora 5.1 km
- Goodman PAR02 A&B Data Centre Campus 5.3 km · 19 MW
- IMADIFF 5.8 km
- RATP data center in Châtillon 6.4 km · 2 MW
- COLT DC Paris III 6.7 km
More OPCORE data centers
- OPCORE DC6-5 France
- OPCORE DC1 France
- OPCORE DC6-2 France
- OPCORE DC6-6 France
- OPCORE - DC5 / PAR5 France
- OPCORE - DC2 / PAR2 France
- OPCORE - DC4 / PAR4 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.