Datacenter Sirius
Datacenter Sirius is an operational data center operated by Natixis in Lieusaint, France. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Natixis |
| Facility power | 14 MW (range 7.2 MW to 23 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,032 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.62137, 2.55337 |
Power and grid
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 152 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter Sirius use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How clean is the power for Datacenter Sirius?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Datacenter Sirius?
Natixis.
Data centers near Lieusaint
- Datacenter Société Generale 4.9 km · 8.3 MW
- Commissariat a l'Energie Atomique Topaze 9.1 km · 0.2 MW
- CDG1 11.0 km · 35 MW
- Datacenter Bouygues Télécom 13.1 km
- Goodman PAR02 A&B Data Centre Campus 17.2 km · 19 MW
- MEDIACTIVE MN3 17.8 km
- OPCORE - DC3 / PAR3 21.3 km · 16 MW
- OPCORE - DC2 / PAR2 21.9 km · 3.7 MW