Data Center Directory

CloudHQ MCC1

CloudHQ MCC1 is an operational data center operated by CloudHQ in Manassas, United States. Our footprint estimate of its power is about 54 MW.

Key facts

StatusOperational
OperatorCloudHQ
Facility power54 MW (range 27 MW to 86 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 44,953 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 23,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Address10880 Airman Ave
Coordinates38.71686, -77.49974
Websitecloudhq.com/locations/mcc1

Power and grid

UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineDominion Transmission Co, interstate pipeline, 4.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.2 °C (2001 to 2025)
Cooling degree days808 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.12 kWh per m² per day
Wind at 50 m4.5 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CloudHQ MCC1 use?

We estimate the facility power at about 54 MW. Estimate from building footprint, low confidence.

How clean is the power for CloudHQ MCC1?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates CloudHQ MCC1?

CloudHQ.

Data centers near Manassas

More CloudHQ data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.