AWS
AWS is a data center under construction operated by Amazon Web Services in Manassas, United States. Our footprint estimate of its power is about 25 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Under construction |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 25 MW (range 12 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,492 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 38.74663, -77.49726 |
Power and grid
| Utility | City Of Manassas (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Dominion Transmission Co, interstate pipeline, 4.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.2 °C (2001 to 2025) |
| Cooling degree days | 808 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.12 kWh per m² per day |
| Wind at 50 m | 4.5 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AWS use?
We estimate the facility power at about 25 MW. Estimate from building footprint, low confidence.
What chips does AWS use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
How clean is the power for AWS?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates AWS?
Amazon Web Services.
Data centers near Manassas
- AWS 490 m · 20 MW
- Digital Realty IAD53 907 m · 31 MW
- Amazon IAD-103 1.2 km · 35 MW
- QTS Manassas DC3 1.4 km · 15 MW
- Digital Realty IAD51 1.4 km · 105 MW
- Amazon IAD-100 1.6 km · 71 MW
- QTS Manassas (MAN1) 1.6 km
- AWS 1.7 km · 61 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.