Cloudpath CT1 (26 Fahey St)

Cloudpath CT1 (26 Fahey St) is an operational data center operated by Cloudpath in Stamford, United States. Our footprint estimate of its power is about 1.7 MW.

Key facts

StatusOperational
OperatorCloudpath
Facility power1.7 MW (range 0.8 MW to 2.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,394 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 730 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asOmega CT1 · amnet Data Center
Address26 Fahey St
Coordinates41.09160, -73.51676
Websiteamnetsystems.com/service-data-center-colocation

Power and grid

Nearest high-voltage substationGlenbrook Substation, 115 kV, 3.3 km away (Eversource)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationNorwalk Substation, 345 kV, 8.4 km away
HV substations within 10 km13
UtilityUnited Illuminating Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityISNE
Nearest gas pipelineTennessee Gas Pipeline, interstate pipeline, 1.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km11 GW in 52 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity308 g CO₂ per kWh (Connecticut, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.1%, nuclear 36.9%, solar 5.5%, oil and other fossil 1.4%, bioenergy 1.3%. Clean power: 44.6%
Industrial power priceUSD 0.162 per kWh (Connecticut, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days504 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.87 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayLow (<10%) (Connecticut)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Cloudpath CT1 (26 Fahey St) use?

We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.

How close is Cloudpath CT1 (26 Fahey St) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Glenbrook Substation (115 kV), about 3.3 km away. The local utility is United Illuminating Co, in the ISNE balancing area.

How clean is the power for Cloudpath CT1 (26 Fahey St)?

The grid in Connecticut emits about 308 g CO₂ per kWh (2025). Largest sources: gas 54.1%, nuclear 36.9%, solar 5.5%.

Who operates Cloudpath CT1 (26 Fahey St)?

Cloudpath.

Data centers near Stamford

More Cloudpath data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.