Cloudpath CT1 (26 Fahey St)
Cloudpath CT1 (26 Fahey St) is an operational data center operated by Cloudpath in Stamford, United States. Our footprint estimate of its power is about 1.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Cloudpath |
| Facility power | 1.7 MW (range 0.8 MW to 2.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,394 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 730 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Omega CT1 · amnet Data Center |
| Address | 26 Fahey St |
| Coordinates | 41.09160, -73.51676 |
| Website | amnetsystems.com/service-data-center-colocation |
Power and grid
| Nearest high-voltage substation | Glenbrook Substation, 115 kV, 3.3 km away (Eversource) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Norwalk Substation, 345 kV, 8.4 km away |
| HV substations within 10 km | 13 |
| Utility | United Illuminating Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Tennessee Gas Pipeline, interstate pipeline, 1.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 11 GW in 52 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 308 g CO₂ per kWh (Connecticut, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.1%, nuclear 36.9%, solar 5.5%, oil and other fossil 1.4%, bioenergy 1.3%. Clean power: 44.6% |
| Industrial power price | USD 0.162 per kWh (Connecticut, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low (<10%) (Connecticut) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cloudpath CT1 (26 Fahey St) use?
We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.
How close is Cloudpath CT1 (26 Fahey St) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Glenbrook Substation (115 kV), about 3.3 km away. The local utility is United Illuminating Co, in the ISNE balancing area.
How clean is the power for Cloudpath CT1 (26 Fahey St)?
The grid in Connecticut emits about 308 g CO₂ per kWh (2025). Largest sources: gas 54.1%, nuclear 36.9%, solar 5.5%.
Who operates Cloudpath CT1 (26 Fahey St)?
Cloudpath.
Data centers near Stamford
- Cloudpath CT2 (1351 Washington Blvd) 4.3 km
- Cloudpath CT19 (5 Landmark Sq) 4.4 km
- Lumen Stamford 4.9 km
- CyrusOne Norwalk 10.2 km
- CyrusOne data center in Norwalk 11.0 km · 13 MW
- Crown Castle White Plains (360 Hamilton) 21.9 km
- Evocative New York (JFK2) 22.3 km
- TierPoint Hawthorne (fka Xand) 25.0 km
More Cloudpath data centers
- Cloudpath CT19 (5 Landmark Sq) United States
- Cloudpath CT2 (1351 Washington Blvd) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.