CyrusOne Norwalk
CyrusOne Norwalk is an operational data center operated by CyrusOne in Norwalk, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Networks | 3 networks PeeringDB. |
| Address | 6 Norden Place (f/k/a 10 Norden Place) |
| Coordinates | 41.11099, -73.39827 |
| Website | cyrusone.com |
Power and grid
| Utility | Norwalk Third Taxing District Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ISNE |
| Nearest gas pipeline | Tennessee Gas Pipeline, interstate pipeline, 1.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 308 g CO₂ per kWh (Connecticut, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.1%, nuclear 36.9%, solar 5.5%, oil and other fossil 1.4%, bioenergy 1.3%. Clean power: 44.6% |
| Industrial power price | USD 0.162 per kWh (Connecticut, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low (<10%) (Connecticut) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for CyrusOne Norwalk?
The grid in Connecticut emits about 308 g CO₂ per kWh (2025). Largest sources: gas 54.1%, nuclear 36.9%, solar 5.5%.
Who operates CyrusOne Norwalk?
CyrusOne.
Data centers near Norwalk
- CyrusOne data center in Norwalk 839 m · 13 MW
- Cloudpath CT1 (26 Fahey St) 10.2 km · 1.7 MW
- Lumen Stamford 13.0 km
- Cloudpath CT19 (5 Landmark Sq) 13.2 km
- Cloudpath CT2 (1351 Washington Blvd) 13.5 km
- Aphorio Carter Trumbull Data Center 25.5 km · 32 MW
- Evocative New York (JFK2) 30.9 km
- Crown Castle White Plains (360 Hamilton) 32.1 km
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.