CyrusOne data center in Norwalk is an operational data center operated by CyrusOne in Norwalk, United States. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 13 MW (range 6.6 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,070 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Norden Place 6, 06855, Norwalk |
| Coordinates | 41.11309, -73.38865 |
| Website | cyrusone.com/data-centers/north-america/norwalk-ct |
Power and grid
| Nearest high-voltage substation | Fitch Substation, 115 kV, 1.6 km away (United Illuminating Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Norwalk Substation, 345 kV, 3.7 km away |
| HV substations within 10 km | 12 |
| Utility | Norwalk Third Taxing District Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Tennessee Gas Pipeline, interstate pipeline, 1.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 9.5 GW in 50 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 308 g CO₂ per kWh (Connecticut, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.1%, nuclear 36.9%, solar 5.5%, oil and other fossil 1.4%, bioenergy 1.3%. Clean power: 44.6% |
| Industrial power price | USD 0.162 per kWh (Connecticut, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.7 °C (2001 to 2025) |
| Cooling degree days | 504 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Low (<10%) (Connecticut) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne data center in Norwalk use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is CyrusOne data center in Norwalk to the power grid?
The nearest high-voltage substation in OpenStreetMap is Fitch Substation (115 kV), about 1.6 km away. The local utility is Norwalk Third Taxing District, in the ISNE balancing area.
How clean is the power for CyrusOne data center in Norwalk?
The grid in Connecticut emits about 308 g CO₂ per kWh (2025). Largest sources: gas 54.1%, nuclear 36.9%, solar 5.5%.
Who operates CyrusOne data center in Norwalk?
CyrusOne.
Data centers near Norwalk
- CyrusOne Norwalk 839 m
- Cloudpath CT1 (26 Fahey St) 11.0 km · 1.7 MW
- Lumen Stamford 13.9 km
- Cloudpath CT19 (5 Landmark Sq) 14.0 km
- Cloudpath CT2 (1351 Washington Blvd) 14.3 km
- Aphorio Carter Trumbull Data Center 24.7 km · 32 MW
- Evocative New York (JFK2) 31.6 km
- Crown Castle White Plains (360 Hamilton) 32.9 km
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.