Comclark Network And Technology is an operational data center in Pasig City, Philippines. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Coordinates | 14.57751, 121.07403 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 400 m away (Meralco) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 500 kV, 6 km away |
| HV substations within 10 km | 36 |
| Power plants within 50 km | 1.4 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 569 g CO₂ per kWh (Philippines, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 55.8%, gas 16.4%, hydro 9.8%, other renewables 7.8%, solar 7.1%. Clean power: 27% |
Climate and water
| Average temperature | 25.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 2,953 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.64 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Philippines) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Comclark Network And Technology to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 400 m away.
How clean is the power for Comclark Network And Technology?
The grid in Philippines emits about 569 g CO₂ per kWh (2025). Largest sources: coal 55.8%, gas 16.4%, hydro 9.8%.
Data centers near Pasig City
- Vitro Pasig Data Center 940 m · 0.8 MW
- VITRO Pasig 1.1 km
- Dataone Asia Philippines 3.4 km
- VITRO Makati 2 5.7 km
- VITRO Makati 1 - Yuchengco Tower 6.4 km
- Equinix MN1 - Manila 6.5 km
- SHIFT DATA - Yuchengco Tower 6.5 km
- STT Makati (Formerly MK2) 7.2 km · 1.6 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.