Equinix MN1 - Manila is an operational data center operated by Equinix in Carmona, Philippines. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 38 networks, 3 internet exchanges PeeringDB. |
| Also known as | Equinix MN3 - Manila |
| Address | ZDRC TechnoHub Center Purificacion Street, Brgy 11, 5600 South Superhighway corner, Arellano St, Makati, 1235 Metro Manila |
| Coordinates | 14.55664, 121.01790 |
| Website | equinix.com/data-centers/asia-pacific-colocation/philippines-colocation/manila-data-centers |
Power and grid
| Nearest high-voltage substation | Legazpi GIS Substation, 115 kV, 300 m away (Meralco) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Paco Substation, 230 kV, 3.4 km away |
| HV substations within 10 km | 37 |
| Power plants within 50 km | 2.9 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 569 g CO₂ per kWh (Philippines, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 55.8%, gas 16.4%, hydro 9.8%, other renewables 7.8%, solar 7.1%. Clean power: 27% |
Climate and water
| Average temperature | 25.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 2,953 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.64 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Philippines) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix MN1 - Manila to the power grid?
The nearest high-voltage substation in OpenStreetMap is Legazpi GIS Substation (115 kV), about 300 m away.
How clean is the power for Equinix MN1 - Manila?
The grid in Philippines emits about 569 g CO₂ per kWh (2025). Largest sources: coal 55.8%, gas 16.4%, hydro 9.8%.
Who operates Equinix MN1 - Manila?
Equinix.
Data centers near Carmona
- VITRO Makati 1 - Yuchengco Tower 486 m
- SHIFT DATA - Yuchengco Tower 521 m
- VITRO Makati 2 996 m
- STT Makati (Formerly MK2) 2.0 km · 1.6 MW
- VITRO Pasig 5.6 km
- Vitro Pasig Data Center 5.8 km · 0.8 MW
- Alibaba Cloud in Philippines 6.0 km
- Comclark Network And Technology 6.5 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.