Vitro Pasig Data Center
Vitro Pasig Data Center is an operational data center operated by ePLDT in Pasig City, Philippines. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ePLDT |
| Facility power | 0.8 MW (range 0.3 MW to 2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,789 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 14.56983, 121.07038 |
Power and grid
| Nearest high-voltage substation | Hillcrest Substation, 115 kV, 500 m away (Meralco) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Taguig EHV Substation, 500 kV, 5.2 km away |
| HV substations within 10 km | 36 |
| Power plants within 50 km | 1.4 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 569 g CO₂ per kWh (Philippines, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 55.8%, gas 16.4%, hydro 9.8%, other renewables 7.8%, solar 7.1%. Clean power: 27% |
Climate and water
| Average temperature | 25.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 2,953 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.64 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Medium - High (20-40%) (Philippines) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vitro Pasig Data Center use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Vitro Pasig Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Hillcrest Substation (115 kV), about 500 m away.
How clean is the power for Vitro Pasig Data Center?
The grid in Philippines emits about 569 g CO₂ per kWh (2025). Largest sources: coal 55.8%, gas 16.4%, hydro 9.8%.
Who operates Vitro Pasig Data Center?
ePLDT.
Data centers near Pasig City
- VITRO Pasig 231 m
- Comclark Network And Technology 940 m
- Dataone Asia Philippines 4.4 km
- VITRO Makati 2 5.2 km
- Equinix MN1 - Manila 5.8 km
- VITRO Makati 1 - Yuchengco Tower 5.9 km
- SHIFT DATA - Yuchengco Tower 5.9 km
- STT Makati (Formerly MK2) 6.4 km · 1.6 MW
More ePLDT data centers
- VITRO Parañaque Philippines
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.