Data Center Directory

VITRO Parañaque

VITRO Parañaque is an operational data center operated by ePLDT in Parañaque, Philippines. Our footprint estimate of its power is about 1.1 MW.

Key facts

StatusOperational
OperatorePLDT
Facility power1.1 MW (range 0.4 MW to 2.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,180 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 470 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressDr. A. Santos Avenue, Parañaque
Coordinates14.46303, 121.02752

Power and grid

Grid carbon intensity569 g CO₂ per kWh (Philippines, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 55.8%, gas 16.4%, hydro 9.8%, other renewables 7.8%, solar 7.1%. Clean power: 27%

Climate and water

Average temperature25.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days2,953 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.64 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Philippines)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does VITRO Parañaque use?

We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.

How clean is the power for VITRO Parañaque?

The grid in Philippines emits about 569 g CO₂ per kWh (2025). Largest sources: coal 55.8%, gas 16.4%, hydro 9.8%.

Who operates VITRO Parañaque?

ePLDT.

Data centers near Parañaque

More ePLDT data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.