CSF CX1 / TelcoHub1 Kuala Lumpur is an operational data center operated by CSF in Cyberjaya, Malaysia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | CSF |
| Networks | 35 networks, 5 internet exchanges PeeringDB. |
| Also known as | TM ONE CBJ5, Cyberjaya |
| Address | CSF Building, Computer Exchange 1, Jalan Teknokrat 6 |
| Coordinates | 2.91322, 101.65565 |
| Website | csf-group.com |
Power and grid
| Nearest high-voltage substation | PMU 132/33kV Cyberjaya Central GIS (CBJC), 132 kV, 900 m away (Tenaga Nasional) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | PMU GIS Cybersouth 4, 275 kV, 1.2 km away |
| HV substations within 10 km | 9 |
| Power plants within 50 km | 10 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.2 °C (2001 to 2025) |
| Cooling degree days | 3,495 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Selangor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is CSF CX1 / TelcoHub1 Kuala Lumpur to the power grid?
The nearest high-voltage substation in OpenStreetMap is PMU 132/33kV Cyberjaya Central GIS (CBJC) (132 kV), about 900 m away.
How clean is the power for CSF CX1 / TelcoHub1 Kuala Lumpur?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Who operates CSF CX1 / TelcoHub1 Kuala Lumpur?
CSF.
Data centers near Cyberjaya
- CX5 / MY02 Cyberjaya Malaysia 654 m · 4.5 MW
- CX2 / MY01 Cyberjaya Malaysia 817 m
- Keppel Data Centres | Basis Bay Data Centre 942 m
- STTGDC KUL1 946 m · 0.7 MW
- Bridge Data Centres - MY02-C2 984 m · 13 MW
- Data Center KUL75 1.1 km · 14 MW
- CJ1 CYBERJAYA 1.1 km · 0.7 MW
- Pi DC Datacenter 1.2 km · 3.5 MW
Sources
Correct this page or get the data