CJ1 CYBERJAYA
CJ1 CYBERJAYA is an operational data center operated by Mytelehaus in Cyberjaya, Malaysia. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Mytelehaus |
| Facility power | 0.7 MW (range 0.3 MW to 1.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,927 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 24 networks, 3 internet exchanges PeeringDB. |
| Also known as | Myklnet Selangor · Equinix KL1 - Kuala Lumpur · Vantage Data Centres Malaysia |
| Address | No.1, Jalan Cyber Point 4, Cyber 8 |
| Coordinates | 2.90419, 101.65199 |
| Website | mytelehaus.com |
Power and grid
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.2 °C (2001 to 2025) |
| Cooling degree days | 3,495 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Selangor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CJ1 CYBERJAYA use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
How clean is the power for CJ1 CYBERJAYA?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Who operates CJ1 CYBERJAYA?
Mytelehaus.
Data centers near Cyberjaya
- Keppel Data Centres | Basis Bay Data Centre 150 m
- STTGDC KUL1 203 m · 0.7 MW
- Vantage Data Centers KUL2 Campus 252 m · 23 MW
- Data Center KUL75 412 m · 14 MW
- Damac Digital, Daria Data Centre KUL01 648 m · 6.6 MW
- Microsoft Datacenter KUL03 666 m · 19 MW
- Pi DC Datacenter 773 m · 3.5 MW
- Data Center KUL21 794 m · 13 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.