Data Center Directory

Microsoft Datacenter KUL03

Microsoft Datacenter KUL03 is an operational data center operated by Microsoft in Cyberjaya, Malaysia. Our footprint estimate of its power is about 19 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power19 MW (range 7.7 MW to 48 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 159,419 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates2.89948, 101.64828

Power and grid

Nearest high-voltage substationPMU GIS Cybersouth 4, 275 kV, 600 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km9
Power plants within 50 km10 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.2 °C (2001 to 2025)
Cooling degree days3,495 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.8 kWh per m² per day
Wind at 50 m3.1 m/s average
Water stress todayLow (<10%) (Selangor)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft Datacenter KUL03 use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Datacenter KUL03 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft Datacenter KUL03 to the power grid?

The nearest high-voltage substation in OpenStreetMap is PMU GIS Cybersouth 4 (275 kV), about 600 m away.

How clean is the power for Microsoft Datacenter KUL03?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.

Who operates Microsoft Datacenter KUL03?

Microsoft.