Data Center KUL21
Data Center KUL21 is an operational data center in Cyberjaya, Malaysia. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 13 MW (range 5.3 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 110,539 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 2.89825, 101.65596 |
Power and grid
| Nearest high-voltage substation | PMU GIS Cybersouth 4, 275 kV, 600 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 10 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.2 °C (2001 to 2025) |
| Cooling degree days | 3,495 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Selangor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data Center KUL21 use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is Data Center KUL21 to the power grid?
The nearest high-voltage substation in OpenStreetMap is PMU GIS Cybersouth 4 (275 kV), about 600 m away.
How clean is the power for Data Center KUL21?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Data centers near Cyberjaya
- Data Center KUL75 596 m · 14 MW
- CJ1 CYBERJAYA 794 m · 0.7 MW
- Keppel Data Centres | Basis Bay Data Centre 851 m
- Microsoft Datacenter KUL03 864 m · 19 MW
- Vantage Data Centers KUL2 Campus 943 m · 23 MW
- STTGDC KUL1 994 m · 0.7 MW
- Damac Digital, Daria Data Centre KUL01 1.4 km · 6.6 MW
- Pi DC Datacenter 1.5 km · 3.5 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.