Data Center Directory

Equinix KL02 Data Center

Equinix KL02 Data Center is an operational data center operated by Equinix in Cyberjaya, Malaysia. Our footprint estimate of its power is about 9 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power9 MW (range 3.6 MW to 23 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 75,006 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 3,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates2.90612, 101.64402

Power and grid

Nearest high-voltage substationPMU GIS Cybersouth 4, 275 kV, 1.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km8
Power plants within 50 km10 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.2 °C (2001 to 2025)
Cooling degree days3,495 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.8 kWh per m² per day
Wind at 50 m3.1 m/s average
Water stress todayLow (<10%) (Selangor)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix KL02 Data Center use?

We estimate the facility power at about 9 MW. Estimate from building footprint, low confidence.

How close is Equinix KL02 Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is PMU GIS Cybersouth 4 (275 kV), about 1.1 km away.

How clean is the power for Equinix KL02 Data Center?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.

Who operates Equinix KL02 Data Center?

Equinix.

Data centers near Cyberjaya

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.