CSL Monet

CSL Monet is an operational data center operated by Angola Cables in Fortaleza, Brazil. Our footprint estimate of its power is about 3.4 MW.

Key facts

StatusOperational
OperatorAngola Cables
Facility power3.4 MW (range 1.7 MW to 5.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,830 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressRua Pintor Antônio Bandeira, Fortaleza
Coordinates-3.73885, -38.45724
Websiteangolacables.co.ao

Power and grid

Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature27.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.3 °C (2001 to 2025)
Cooling degree days3,373 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.76 kWh per m² per day
Wind at 50 m7.7 m/s average
Water stress todayLow - Medium (10-20%) (Ceará)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does CSL Monet use?

We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.

How clean is the power for CSL Monet?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Who operates CSL Monet?

Angola Cables.

Data centers near Fortaleza

More Angola Cables data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.