Tecto TFOR1/2 (ex Globenet CLS & Big Lobster)
Tecto TFOR1/2 (ex Globenet CLS & Big Lobster) is an operational data center operated by Tecto Data Centers in Fortaleza, Brazil. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Tecto Data Centers |
| Networks | 119 networks, 2 internet exchanges PeeringDB. |
| Address | Rua Raimundo Esteves 333, Praia do Futuro |
| Coordinates | -3.73479, -38.45801 |
| Website | tecto.com |
Power and grid
| Nearest high-voltage substation | Subestação Delmiro Gouveia, 230 kV, 8.7 km away (Companhia Hidro Elétrica do São Francisco) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 1.7 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 27.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.3 °C (2001 to 2025) |
| Cooling degree days | 3,373 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.76 kWh per m² per day |
| Wind at 50 m | 7.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ceará) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Tecto TFOR1/2 (ex Globenet CLS & Big Lobster) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Delmiro Gouveia (230 kV), about 8.7 km away.
How clean is the power for Tecto TFOR1/2 (ex Globenet CLS & Big Lobster)?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Tecto TFOR1/2 (ex Globenet CLS & Big Lobster)?
Tecto Data Centers.
Data centers near Fortaleza
- CSL Monet 460 m · 3.4 MW
- AngoNAP Fortaleza 514 m · 15 MW
- Cirion Fortaleza 911 m
- ProveNET - IDC-FLA - Fortaleza 970 m
- Tecto TFOR3 (ex Mega Lobster) 2.6 km
- Giga+ (Alloha Fibra) 2.9 km
- SECRELNET INFORMATICA 4.3 km
- SecrelNet Informática Fortaleza 6.4 km
More Tecto Data Centers data centers
- Tecto TBAQ1/2 (ex Globenet CLS) Colombia
- Tecto TBAQ3 Colombia
- Tecto TFOR3 (ex Mega Lobster) Brazil
- Tecto TGIG1 (ex Globenet CLS RJ) Brazil
- Tecto TGIG2 (ex Arcos) Brazil
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.