CSSNW Bellingham
CSSNW Bellingham is an operational data center operated by CSS Communications in Bellingham, United States. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CSS Communications |
| Facility power | 0.7 MW (range 0.3 MW to 1.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 571 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 6 networks PeeringDB. |
| Address | 1911 C Street |
| Coordinates | 48.75731, -122.48050 |
| Website | cssnw.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CSSNW Bellingham use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
Who operates CSSNW Bellingham?
CSS Communications.
Data centers near Bellingham
- Data center in Burnaby 65.6 km
- Simon Fraser University/Compute Canada Cedar 65.9 km · 0.6 MW
- eStruxture VAN-3 66.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.