CXD Infrastructure Solutions
CXD Infrastructure Solutions is an operational data center operated by DXC UKI in Maidstone, United Kingdom. Our footprint estimate of its power is about 5.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DXC UKI |
| Facility power | 5.6 MW (range 2.8 MW to 8.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,626 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Lodge Road, ME14 5EH, Maidstone |
| Coordinates | 51.27883, 0.54721 |
Power and grid
| Nearest high-voltage substation | Maidstone Grid, 132 kV, 1 km away (UK Power Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Kingsnorth Substation, 400 kV, 15.9 km away |
| HV substations within 10 km | 2 |
| Power plants within 50 km | 6.2 GW in 85 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.7 °C (2001 to 2025) |
| Cooling degree days | 38 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CXD Infrastructure Solutions use?
We estimate the facility power at about 5.6 MW. Estimate from building footprint, low confidence.
How close is CXD Infrastructure Solutions to the power grid?
The nearest high-voltage substation in OpenStreetMap is Maidstone Grid (132 kV), about 1 km away.
How clean is the power for CXD Infrastructure Solutions?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates CXD Infrastructure Solutions?
DXC UKI.
Data centers near Maidstone
- Custodian CDC Maidstone 1 191 m
- Kent Science Park 12.9 km
- Sota Datacentre 13.0 km · 6 MW
- Custodian CDC Dartford DA2 27.9 km · 4.2 MW
- Fujitsu Data Centre 29.6 km · 22 MW
- CityFibre Cabinets 33.1 km
- ChunkyChips Data Centre 34.4 km
- Imperium 315 34.5 km · 32 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.