Imperium 315

Imperium 315 is an operational data center operated by NYSE Euronext in Basildon, United Kingdom. Our footprint estimate of its power is about 32 MW.

Key facts

StatusOperational
OperatorNYSE Euronext
Facility power32 MW (range 16 MW to 51 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 26,667 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 14,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressGardiners Lane South, Basildon
Coordinates51.58667, 0.48488

Power and grid

Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature30.7 °C (2001 to 2025)
Cooling degree days38 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m7.4 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Imperium 315 use?

We estimate the facility power at about 32 MW. Estimate from building footprint, low confidence.

How clean is the power for Imperium 315?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Imperium 315?

NYSE Euronext.