Imperium 315
Imperium 315 is an operational data center operated by NYSE Euronext in Basildon, United Kingdom. Our footprint estimate of its power is about 32 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NYSE Euronext |
| Facility power | 32 MW (range 16 MW to 51 MW) Estimate from building footprint, low confidence. Footprint estimate: about 26,667 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Gardiners Lane South, Basildon |
| Coordinates | 51.58667, 0.48488 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.7 °C (2001 to 2025) |
| Cooling degree days | 38 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Imperium 315 use?
We estimate the facility power at about 32 MW. Estimate from building footprint, low confidence.
How clean is the power for Imperium 315?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Imperium 315?
NYSE Euronext.
Data centers near Basildon
- ChunkyChips Data Centre 1.4 km
- EXA Edge DC Wickford 8.5 km
- CityFibre Cabinets 11.2 km
- Fujitsu Data Centre 18.9 km · 22 MW
- Custodian CDC Dartford DA2 21.6 km · 4.2 MW
- NTT London 1 21.8 km · 23 MW
- OVH data center in Belvedere 24.4 km · 3.3 MW
- Kao Data KLON-01 31.8 km · 4.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.