DartPoints Charleston, SC - CHS1
DartPoints Charleston, SC - CHS1 is an operational data center operated by DartPoints in Ladson, United States. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | DartPoints |
| Facility power | 1.5 MW (range 0.8 MW to 2.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,283 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Also known as | DartPoints Charleston |
| Address | 8480 Palmetto Commerce Parkway |
| Coordinates | 32.96489, -80.10128 |
| Website | dartpoints.com/locations/north-charleston |
Power and grid
| Nearest high-voltage substation | Mercedes Substation, 115 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Pepperhill Substation, 230 kV, 3.3 km away |
| HV substations within 10 km | 24 |
| Utility | Dominion Energy South Carolina, INC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SCEG |
| Nearest gas pipeline | South Carolina PL Corp, interstate pipeline, 500 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.5 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 288 g CO₂ per kWh (South Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 53.9%, gas 21.4%, coal 17.3%, solar 3.8%, hydro 2.1%. Clean power: 61.3% |
| Industrial power price | USD 0.079 per kWh (South Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 19 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.1 °C (2001 to 2025) |
| Cooling degree days | 1,411 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.62 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Medium - High (20-40%) (South Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does DartPoints Charleston, SC - CHS1 use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
How close is DartPoints Charleston, SC - CHS1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Mercedes Substation (115 kV), about 200 m away. The local utility is Dominion Energy South Carolina, INC, in the SCEG balancing area.
How clean is the power for DartPoints Charleston, SC - CHS1?
The grid in South Carolina emits about 288 g CO₂ per kWh (2025). Largest sources: nuclear 53.9%, gas 21.4%, coal 17.3%.
Who operates DartPoints Charleston, SC - CHS1?
DartPoints.
Data centers near Ladson
- Google 12.0 km · 74 MW
- Google 12.2 km · 13 MW
- Google data center in Goose Creek 12.3 km · 20 MW
- Google Berkeley County Data Center 12.3 km · 82 MW
- Google 12.5 km · 16 MW
More DartPoints data centers
- DartPoints Columbus, IN - CLU1 United States
- DartPoints Spartanburg, SC - SPA1 United States
- DartPoints Baton Rouge, LA - BTR1 United States
- DartPoints Cincinnati, OH - CVG1 United States
- DartPoints Columbia, SC - CAE1 United States
- DartPoints Dublin, OH - CMH1 United States
- DartPoints Greenville, SC - GSP1 United States
- DartPoints North Liberty, IA United States