Google Berkeley County Data Center
Google Berkeley County Data Center is an operational data center operated by Google in Goose Creek, United States. Our footprint estimate of its power is about 82 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 82 MW (range 33 MW to 204 MW) Estimate from building footprint, low confidence. Footprint estimate: about 681,511 m² site outline x 0.12 kW per m² of land. |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 35,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | |
| Coordinates | 33.06395, -80.04254 |
Power and grid
| Nearest high-voltage substation | Google Substation #1, 115 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Mount Holly Smeltery Substation, 230 kV, 2 km away |
| HV substations within 10 km | 15 |
| Utility | Berkeley Electric Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SC |
| Nearest gas pipeline | South Carolina PL Corp, interstate pipeline, 10.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.5 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 288 g CO₂ per kWh (South Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 53.9%, gas 21.4%, coal 17.3%, solar 3.8%, hydro 2.1%. Clean power: 61.3% |
| Industrial power price | USD 0.079 per kWh (South Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 19 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.1 °C (2001 to 2025) |
| Cooling degree days | 1,411 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.62 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Medium - High (20-40%) (South Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Berkeley County Data Center use?
We estimate the facility power at about 82 MW. Estimate from building footprint, low confidence.
What chips does Google Berkeley County Data Center use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How close is Google Berkeley County Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Google Substation #1 (115 kV), about 200 m away. The local utility is Berkeley Electric Coop INC, in the SC balancing area.
How clean is the power for Google Berkeley County Data Center?
The grid in South Carolina emits about 288 g CO₂ per kWh (2025). Largest sources: nuclear 53.9%, gas 21.4%, coal 17.3%.
Who operates Google Berkeley County Data Center?
Google.
Data centers near Goose Creek
- Google 311 m · 74 MW
- Google 332 m · 13 MW
- Google 383 m · 16 MW
- Google data center in Goose Creek 452 m · 20 MW
- DartPoints Charleston, SC - CHS1 12.3 km · 1.5 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.