Data center in Aylesbury is an operational data center in Aylesbury, United Kingdom. Our footprint estimate of its power is about 1.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.1 MW (range 0.6 MW to 1.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 919 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 470 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.88797, -0.81846 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 400 kV, 7.4 km away (National Grid Electricity Transmission) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 3.5 GW in 114 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.2 °C (2001 to 2025) |
| Cooling degree days | 33 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.88 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Aylesbury use?
We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.
How close is Data center in Aylesbury to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (400 kV), about 7.4 km away.
How clean is the power for Data center in Aylesbury?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Aylesbury
- Creslow Park 348 m
- nLighten Milton Keynes LTN1 17.1 km
- nLighten Milton Keynes 17.1 km · 7.6 MW
- Pulsant data center in Milton Keynes 19.0 km · 4.7 MW
- Data center in Dunstable 21.8 km · 8.6 MW
- NTT Hemel Hempstead 2 Data Center (HH2) 29.3 km · 11 MW
- NTT Hemel Hempstead 3 Data Center (HH3) 29.7 km · 21 MW
- NTT Hemel Hempstead 1 Data Center (HH1) 29.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.