Data center in Biryulëvo Zapadnoye is an operational data center in Biryulëvo Zapadnoye, Russia. Our footprint estimate of its power is about 4.8 MW.

Key facts

StatusOperational
Facility power4.8 MW (range 2.4 MW to 7.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,973 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Addressулица Подольских Курсантов 15Б с2
Coordinates55.60370, 37.64149

Power and grid

Nearest high-voltage substationЦарицыно, 110 kV, 800 m away (ОАО «РЖД»)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationЧертаново, 220 kV, 1 km away
HV substations within 10 km46
Power plants within 50 km13 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity447 g CO₂ per kWh (Russia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7%

Climate and water

Average temperature4.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.3 °C (2001 to 2025)
Cooling degree days92 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.86 kWh per m² per day
Wind at 50 m6.5 m/s average
Water stress todayLow - Medium (10-20%) (Russia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Biryulëvo Zapadnoye use?

We estimate the facility power at about 4.8 MW. Estimate from building footprint, low confidence.

How close is Data center in Biryulëvo Zapadnoye to the power grid?

The nearest high-voltage substation in OpenStreetMap is Царицыно (110 kV), about 800 m away.

How clean is the power for Data center in Biryulëvo Zapadnoye?

The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.

Data centers near Biryulëvo Zapadnoye

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.