IXcellerate MOS5
IXcellerate MOS5 is an operational data center operated by IXcellerate in Moscow, Russia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | IXcellerate |
| Networks | 9 networks PeeringDB. |
| Also known as | IXcellerate MOS6 |
| Address | Podolskikh Kursantov 15B |
| Coordinates | 55.60759, 37.62494 |
| Website | ixcellerate.ru |
Power and grid
| Nearest high-voltage substation | Чертаново, 220 kV, 200 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 47 |
| Power plants within 50 km | 13 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 447 g CO₂ per kWh (Russia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7% |
Climate and water
| Average temperature | 4.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.3 °C (2001 to 2025) |
| Cooling degree days | 92 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.86 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Russia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is IXcellerate MOS5 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Чертаново (220 kV), about 200 m away.
How clean is the power for IXcellerate MOS5?
The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.
Who operates IXcellerate MOS5?
IXcellerate.
Data centers near Moscow
- Nubes Alto 862 m
- Data center in Biryulëvo Zapadnoye 1.1 km · 4.8 MW
- IXcellerate South MOS5 1.3 km · 32 MW
- M1 StackTelecom Datacenter 2.2 km
- SPACE-IX 6.9 km
- 3data B17 7.0 km
- DataHouse Moscow 7.3 km
- RTP MK15 7.6 km
More IXcellerate data centers
- IXcellerate South MOS5 Russia
- IXcellerate MOS1 Russia
- IXcellerate MOS2 Russia