IXcellerate MOS1
IXcellerate MOS1 is an operational data center operated by IXcellerate in Moscow, Russia. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | IXcellerate |
| Facility power | 21 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,721 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 41 networks, 6 internet exchanges PeeringDB. |
| Also known as | IXcellerate North MOS 2 · IXcellerate North MOS 1 · IXcellerate North MOS 3 · IXcellerate North MOS 4 |
| Address | Altufievskoe shosse 33G |
| Coordinates | 55.86235, 37.57740 |
| Website | ixcellerate.com/data-centers/moscow-north-campus/#mos1 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 220 kV, 1.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 57 |
| Power plants within 50 km | 13 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 447 g CO₂ per kWh (Russia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7% |
Climate and water
| Average temperature | 4.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.1 °C (2001 to 2025) |
| Cooling degree days | 86 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.8 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Russia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does IXcellerate MOS1 use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
How close is IXcellerate MOS1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (220 kV), about 1.7 km away.
How clean is the power for IXcellerate MOS1?
The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.
Who operates IXcellerate MOS1?
IXcellerate.
Data centers near Moscow
- 3data A35 400 m
- IXcellerate MOS2 2.0 km
- e-Style ISP LLC 3.2 km
- Rostelecom Moscow-V 4.1 km · 29 MW
- NORD-4 4.8 km · 5.2 MW
- Data center in Novokhovrino 4.9 km · 3.1 MW
- Stack.HTH 6.0 km
- Tech.ru DC2 6.3 km
More IXcellerate data centers
- IXcellerate South MOS5 Russia
- IXcellerate MOS2 Russia
- IXcellerate MOS5 Russia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.