Data center in Independence
Data center in Independence is an operational data center in Independence, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Address | Bly 251, 64056, Independence |
| Coordinates | 39.10383, -94.30446 |
Power and grid
| Utility | City Of Independence (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SWPP |
| Nearest gas pipeline | Southern Star Central Gas PL Co, interstate pipeline, 12.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 674 g CO₂ per kWh (Missouri, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 63.1%, gas 13%, nuclear 9.8%, wind 8.9%, solar 3.3%. Clean power: 23.7% |
| Industrial power price | USD 0.099 per kWh (Missouri, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.4 °C (2001 to 2025) |
| Cooling degree days | 784 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Missouri) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Data center in Independence?
The grid in Missouri emits about 674 g CO₂ per kWh (2025). Largest sources: coal 63.1%, gas 13%, nuclear 9.8%.
Data centers near Independence
- Data center in Independence 280 m
- LightEdge Kansas City Subtropolis (KCI1) 15.6 km
- Iron Mountain Data Center - Kansas City (KCM-1) 19.9 km
- Patmos KC1 22.7 km
- ProRacks Datacenter- Kansas City 22.7 km
- Lumen Kansas City 22.8 km
- Google Kansas City East 23.6 km · 126 MW
- Oak Tower 23.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.