Google Kansas City East

Google Kansas City East is an operational AI data center operated by Google in Kansas City, United States. Its power is about 126 MW. Epoch AI estimates about 203,000 H100-equivalent AI chips (NVIDIA H200 SXM).

Key facts

StatusOperational
OperatorGoogle
Facility power126 MW
Reported (Epoch AI or owner data)
IT power105 MW
AI compute203,000 H100-equivalents
AI chipsNVIDIA H200 SXM
Reported (Epoch AI or owner data)
Chip count4,000
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 58,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 4.0 billion
Epoch AI estimate, 2025 USD.
Coordinates39.10010, -94.57814 (city level)

Power and grid

Nearest high-voltage substationCharlotte Substation, 161 kV, 800 m away (Evergy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationHawthorn Substation, 345 kV, 9.1 km away
HV substations within 10 km33
UtilityCity Of Kansas City (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authoritySWPP
Nearest gas pipelinePanhandle Eastern PL Co, interstate pipeline, 7.7 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.2 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity332 g CO₂ per kWh (Kansas, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 46.9%, coal 30.6%, nuclear 14.7%, gas 6.5%, solar 1.1%. Clean power: 62.8%
Industrial power priceUSD 0.085 per kWh (Kansas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.4 °C (2001 to 2025)
Cooling degree days784 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.23 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayHigh (40-80%) (Kansas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2023-12-0100Land clearing begins.
2024-03-0100Foundation work begins on Building 1
2024-10-0100Foundation work begins on Building 2. Building 1 roof is fully black.
2025-07-0100Foundation work begins for Building 3. Building 1 generators seem complete.
2025-11-0100Foundation work begins for Building 4. Building 2 roof is almost complete, and construction appears to have started on cooling. Building 1 cooling construction continues, and the substation right next to it seems finished as well.
2026-04-1600Building 1 is almost complete, with only cooling needing 4 more fans. Building 2 backup generator construction has begun, and cooling tower installation is about halfway complete. Building 3's roof is almost complete, and construction has started on generators and cooling. A clear foundation has been cleared for Building 4, though no construction has begun.
2026-08-01126 MW203,000Building 1 operational. Estimated based on present construction progress and typical timelines.

Source: Epoch AI Frontier Data Centers.

GPU clusters at this site

ClusterChipsCountPowerSince
Nebius Kansas City Phase 1NVIDIA H200 SXM4,0005 MW2025-04-15

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Google Kansas City East use?

Public data puts the facility power at about 126 MW. Reported (Epoch AI or owner data).

What chips does Google Kansas City East use?

Reported chips: NVIDIA H200 SXM.

How close is Google Kansas City East to the power grid?

The nearest high-voltage substation in OpenStreetMap is Charlotte Substation (161 kV), about 800 m away. The local utility is City Of Kansas City, in the SWPP balancing area.

How clean is the power for Google Kansas City East?

The grid in Kansas emits about 332 g CO₂ per kWh (2025). Largest sources: wind 46.9%, coal 30.6%, nuclear 14.7%.

Who operates Google Kansas City East?

Google.