Google Kansas City East
Google Kansas City East is an operational AI data center operated by Google in Kansas City, United States. Its power is about 126 MW. Epoch AI estimates about 203,000 H100-equivalent AI chips (NVIDIA H200 SXM).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 126 MW Reported (Epoch AI or owner data) |
| IT power | 105 MW |
| AI compute | 203,000 H100-equivalents |
| AI chips | NVIDIA H200 SXM Reported (Epoch AI or owner data) |
| Chip count | 4,000 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 58,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 4.0 billion Epoch AI estimate, 2025 USD. |
| Coordinates | 39.10010, -94.57814 (city level) |
Power and grid
| Nearest high-voltage substation | Charlotte Substation, 161 kV, 800 m away (Evergy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hawthorn Substation, 345 kV, 9.1 km away |
| HV substations within 10 km | 33 |
| Utility | City Of Kansas City (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SWPP |
| Nearest gas pipeline | Panhandle Eastern PL Co, interstate pipeline, 7.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.2 GW in 21 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 332 g CO₂ per kWh (Kansas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 46.9%, coal 30.6%, nuclear 14.7%, gas 6.5%, solar 1.1%. Clean power: 62.8% |
| Industrial power price | USD 0.085 per kWh (Kansas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.4 °C (2001 to 2025) |
| Cooling degree days | 784 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | High (40-80%) (Kansas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-12-01 | 0 | 0 | Land clearing begins. |
| 2024-03-01 | 0 | 0 | Foundation work begins on Building 1 |
| 2024-10-01 | 0 | 0 | Foundation work begins on Building 2. Building 1 roof is fully black. |
| 2025-07-01 | 0 | 0 | Foundation work begins for Building 3. Building 1 generators seem complete. |
| 2025-11-01 | 0 | 0 | Foundation work begins for Building 4. Building 2 roof is almost complete, and construction appears to have started on cooling. Building 1 cooling construction continues, and the substation right next to it seems finished as well. |
| 2026-04-16 | 0 | 0 | Building 1 is almost complete, with only cooling needing 4 more fans. Building 2 backup generator construction has begun, and cooling tower installation is about halfway complete. Building 3's roof is almost complete, and construction has started on generators and cooling. A clear foundation has been cleared for Building 4, though no construction has begun. |
| 2026-08-01 | 126 MW | 203,000 | Building 1 operational. Estimated based on present construction progress and typical timelines. |
Source: Epoch AI Frontier Data Centers.
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Nebius Kansas City Phase 1 | NVIDIA H200 SXM | 4,000 | 5 MW | 2025-04-15 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Kansas City East use?
Public data puts the facility power at about 126 MW. Reported (Epoch AI or owner data).
What chips does Google Kansas City East use?
Reported chips: NVIDIA H200 SXM.
How close is Google Kansas City East to the power grid?
The nearest high-voltage substation in OpenStreetMap is Charlotte Substation (161 kV), about 800 m away. The local utility is City Of Kansas City, in the SWPP balancing area.
How clean is the power for Google Kansas City East?
The grid in Kansas emits about 332 g CO₂ per kWh (2025). Largest sources: wind 46.9%, coal 30.6%, nuclear 14.7%.
Who operates Google Kansas City East?
Google.
Data centers near Kansas City
- Oak Tower 133 m
- Netrality Kansas City - 1102 Grand 267 m
- Level(3) Kansas City 372 m
- Patmos KC2 606 m · 106 MW
- Patmos KC1 994 m
- ProRacks Datacenter- Kansas City 1.0 km
- Lumen Kansas City 1.3 km
- UnReal Servers 3.7 km
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.