Level(3) Kansas City
Level(3) Kansas City is an operational data center operated by Lumen Technologies in Kansas City, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Networks | 14 networks, 1 internet exchanges PeeringDB. |
| Address | 1100 Walnut Street |
| Coordinates | 39.10052, -94.58242 |
| Website | level3.com |
Power and grid
| Utility | City Of Kansas City (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SWPP |
| Nearest gas pipeline | Panhandle Eastern PL Co, interstate pipeline, 7.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 332 g CO₂ per kWh (Kansas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 46.9%, coal 30.6%, nuclear 14.7%, gas 6.5%, solar 1.1%. Clean power: 62.8% |
| Industrial power price | USD 0.085 per kWh (Kansas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.4 °C (2001 to 2025) |
| Cooling degree days | 784 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | High (40-80%) (Kansas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Level(3) Kansas City?
The grid in Kansas emits about 332 g CO₂ per kWh (2025). Largest sources: wind 46.9%, coal 30.6%, nuclear 14.7%.
Who operates Level(3) Kansas City?
Lumen Technologies.
Data centers near Kansas City
- Netrality Kansas City - 1102 Grand 128 m
- Oak Tower 309 m
- Google Kansas City East 372 m · 126 MW
- Patmos KC2 694 m · 106 MW
- ProRacks Datacenter- Kansas City 1.3 km
- Patmos KC1 1.4 km
- Lumen Kansas City 1.6 km
- UnReal Servers 3.7 km
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.