Data center in Jersey Village
Data center in Jersey Village is an operational data center in Jersey Village, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 11 MW (range 5.5 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,240 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 29.82158, -95.57080 |
Power and grid
| Nearest high-voltage substation | Addicks Substation, 345 kV, 200 m away (CenterPoint Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 11 |
| Utility | San Bernard Electric Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | Kinder Morgan Texas Pipeline Co, intrastate pipeline, 1.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 15 GW in 36 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 1,754 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Jersey Village use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is Data center in Jersey Village to the power grid?
The nearest high-voltage substation in OpenStreetMap is Addicks Substation (345 kV), about 200 m away. The local utility is San Bernard Electric Coop, INC, in the ERCO balancing area.
How clean is the power for Data center in Jersey Village?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Jersey Village
- Databank Houston West (HOU3) 2.7 km
- Databank Houston West (HOU1) (HOU2) 2.9 km
- Data Foundry Houston 1 12.5 km
- Databank Houston Galleria (HOU5) 16.0 km
- EdgeConneX Houston (EDCHOU01) 17.1 km
- Element Critical Houston HOU1 18.0 km · 3.3 MW
- DXC Technology data center in Cypress 19.3 km · 33 MW
- Data Foundry Houston 2 19.7 km · 10 MW
Sources
Correct this page or get the data