Data Center Directory

Data center in Jersey Village

Data center in Jersey Village is an operational data center in Jersey Village, United States. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
Facility power11 MW (range 5.5 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,240 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates29.82158, -95.57080

Power and grid

Nearest high-voltage substationAddicks Substation, 345 kV, 200 m away (CenterPoint Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km11
UtilitySan Bernard Electric Coop, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineKinder Morgan Texas Pipeline Co, intrastate pipeline, 1.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km15 GW in 36 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature20.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.7 °C (2001 to 2025)
Cooling degree days1,754 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.65 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Jersey Village use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is Data center in Jersey Village to the power grid?

The nearest high-voltage substation in OpenStreetMap is Addicks Substation (345 kV), about 200 m away. The local utility is San Bernard Electric Coop, INC, in the ERCO balancing area.

How clean is the power for Data center in Jersey Village?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Data centers near Jersey Village

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.