Data center in Lohja
Data center in Lohja is an operational data center in Lohja, Finland. Our footprint estimate of its power is about 78 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 78 MW (range 39 MW to 125 MW) Estimate from building footprint, low confidence. Footprint estimate: about 64,936 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 33,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 60.17662, 24.00081 |
Power and grid
| Grid carbon intensity | 59 g CO₂ per kWh (Finland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 39.8%, wind 27.4%, hydro 15.1%, bioenergy 12.5%, oil and other fossil 2.3%. Clean power: 96.2% |
| Industrial power price | EUR 0.076 per kWh (Finland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Water stress today | Low (<10%) (Finland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Lohja use?
We estimate the facility power at about 78 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Lohja?
The grid in Finland emits about 59 g CO₂ per kWh (2025). Largest sources: nuclear 39.8%, wind 27.4%, hydro 15.1%.
Data centers near Lohja
- atNorth FIN03 41.5 km
- atNorth FIN02 42.7 km
- Equinix HE7 - Helsinki, Sinimäki 42.9 km · 11 MW
- Equinix HE6 - Helsinki, Sinimäki 43.1 km · 4.6 MW
- Elisa Espoo Tapiola 44.1 km
- IP-Only Espoo 44.9 km
- Elisa Espoo Säterinportti 45.0 km
- Innopoli 45.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.