Data center in Olathe
Data center in Olathe is an operational data center in Olathe, United States. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 14 MW (range 6.9 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,528 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | West Valley Parkway 23800, 66061, Olathe |
| Coordinates | 38.93920, -94.86019 |
Power and grid
| Utility | City Of Kansas City (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SWPP |
| Nearest gas pipeline | Southern Star Central Gas PL Co, interstate pipeline, 1.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 332 g CO₂ per kWh (Kansas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 46.9%, coal 30.6%, nuclear 14.7%, gas 6.5%, solar 1.1%. Clean power: 62.8% |
| Industrial power price | USD 0.085 per kWh (Kansas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | High (40-80%) (Kansas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Olathe use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
How clean is the power for Data center in Olathe?
The grid in Kansas emits about 332 g CO₂ per kWh (2025). Largest sources: wind 46.9%, coal 30.6%, nuclear 14.7%.
Data centers near Olathe
- U.S. Bank National Data Process Center 549 m · 26 MW
- LightEdge Kansas City Cavern (KCI2) 6.3 km
- DataBank Kansas City (MCI3) 7.9 km · 4.1 MW
- Data center in Lenexa 8.1 km
- TierPoint Kansas City - Lenexa 9.1 km · 5.5 MW
- WANSEC DC16 12.8 km
- DataBank Kansas City (MCI2) 13.7 km
- Netrality Kansas City Metro – KC2 | 7801 Nieman 13.8 km