U.S. Bank National Data Process Center is an operational data center in Olathe, United States. Our footprint estimate of its power is about 26 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 26 MW (range 13 MW to 42 MW) Estimate from building footprint, low confidence. Footprint estimate: about 21,791 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | West Valley Parkway 24101, 66061, Olathe |
| Coordinates | 38.93559, -94.86450 |
Power and grid
| Nearest high-voltage substation | Cedar Creek Substation, 161 kV, 800 m away (Evergy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 87th Street Substation, 345 kV, 4.3 km away |
| HV substations within 10 km | 12 |
| Utility | Evergy Metro (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SWPP |
| Nearest gas pipeline | Southern Star Central Gas PL Co, interstate pipeline, 1.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.1 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 332 g CO₂ per kWh (Kansas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 46.9%, coal 30.6%, nuclear 14.7%, gas 6.5%, solar 1.1%. Clean power: 62.8% |
| Industrial power price | USD 0.085 per kWh (Kansas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.6 °C (2001 to 2025) |
| Cooling degree days | 811 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.23 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | High (40-80%) (Kansas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does U.S. Bank National Data Process Center use?
We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.
How close is U.S. Bank National Data Process Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Cedar Creek Substation (161 kV), about 800 m away. The local utility is Evergy Metro, in the SWPP balancing area.
How clean is the power for U.S. Bank National Data Process Center?
The grid in Kansas emits about 332 g CO₂ per kWh (2025). Largest sources: wind 46.9%, coal 30.6%, nuclear 14.7%.
Data centers near Olathe
- Data center in Olathe 549 m · 14 MW
- LightEdge Kansas City Cavern (KCI2) 6.7 km
- DataBank Kansas City (MCI3) 8.2 km · 4.1 MW
- Data center in Lenexa 8.4 km
- TierPoint Kansas City - Lenexa 9.5 km · 5.5 MW
- WANSEC DC16 13.3 km
- DataBank Kansas City (MCI2) 14.2 km
- Netrality Kansas City Metro – KC2 | 7801 Nieman 14.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.