Data Center Directory

U.S. Bank National Data Process Center

U.S. Bank National Data Process Center is an operational data center in Olathe, United States. Our footprint estimate of its power is about 26 MW.

Key facts

StatusOperational
Facility power26 MW (range 13 MW to 42 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 21,791 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 11,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWest Valley Parkway 24101, 66061, Olathe
Coordinates38.93559, -94.86450

Power and grid

Nearest high-voltage substationCedar Creek Substation, 161 kV, 800 m away (Evergy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substation87th Street Substation, 345 kV, 4.3 km away
HV substations within 10 km12
UtilityEvergy Metro (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authoritySWPP
Nearest gas pipelineSouthern Star Central Gas PL Co, interstate pipeline, 1.4 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.1 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity332 g CO₂ per kWh (Kansas, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 46.9%, coal 30.6%, nuclear 14.7%, gas 6.5%, solar 1.1%. Clean power: 62.8%
Industrial power priceUSD 0.085 per kWh (Kansas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.6 °C (2001 to 2025)
Cooling degree days811 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.23 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayHigh (40-80%) (Kansas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does U.S. Bank National Data Process Center use?

We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.

How close is U.S. Bank National Data Process Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Cedar Creek Substation (161 kV), about 800 m away. The local utility is Evergy Metro, in the SWPP balancing area.

How clean is the power for U.S. Bank National Data Process Center?

The grid in Kansas emits about 332 g CO₂ per kWh (2025). Largest sources: wind 46.9%, coal 30.6%, nuclear 14.7%.

Data centers near Olathe

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.