Data Center Directory

Data center in Pedro Escobedo

Data center in Pedro Escobedo is an operational data center in Pedro Escobedo, Mexico. Our footprint estimate of its power is about 4 MW.

Key facts

StatusOperational
Facility power4 MW (range 1.6 MW to 10 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 33,488 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates20.59234, -100.16274

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 800 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 400 kV, 12 km away
HV substations within 10 km10
Power plants within 50 km700 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity481 g CO₂ per kWh (Mexico, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2%

Climate and water

Average temperature16.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.4 °C (2001 to 2025)
Cooling degree days252 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.62 kWh per m² per day
Wind at 50 m4.8 m/s average
Water stress todayHigh (40-80%) (Mexico)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Pedro Escobedo use?

We estimate the facility power at about 4 MW. Estimate from building footprint, low confidence.

How close is Data center in Pedro Escobedo to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 800 m away.

How clean is the power for Data center in Pedro Escobedo?

The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.

Data centers near Pedro Escobedo

Sources

Correct this page or get the data