Data Center Directory

KIO Querétaro 1 (QRO1)

KIO Querétaro 1 (QRO1) is an operational data center operated by KIO in El Marques, Mexico. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorKIO
Networks69 networks, 4 internet exchanges
PeeringDB.
AddressPrivada de la Princesa 4, Parque Industrial el Marques
Coordinates20.56791, -100.25414
Websitekio.tech

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 1.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationConín, 230 kV, 3.9 km away
HV substations within 10 km15
Power plants within 50 km730 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity481 g CO₂ per kWh (Mexico, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2%

Climate and water

Average temperature17.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.2 °C (2001 to 2025)
Cooling degree days416 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.89 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayHigh (40-80%) (Mexico)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is KIO Querétaro 1 (QRO1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.9 km away.

How clean is the power for KIO Querétaro 1 (QRO1)?

The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.

Who operates KIO Querétaro 1 (QRO1)?

KIO.

Data centers near El Marques

More KIO data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.