Centro de datos KIO QRO1 y QRO2
Centro de datos KIO QRO1 y QRO2 is an operational data center operated by KIO in Saldarriaga, Mexico. Our footprint estimate of its power is about 3.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | KIO |
| Facility power | 3.4 MW (range 1.3 MW to 8.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 28,007 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 20.56636, -100.25672 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 1.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Conín, 230 kV, 3.7 km away |
| HV substations within 10 km | 15 |
| Power plants within 50 km | 730 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Average temperature | 17.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.2 °C (2001 to 2025) |
| Cooling degree days | 416 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.89 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | High (40-80%) (Mexico) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de datos KIO QRO1 y QRO2 use?
We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.
How close is Centro de datos KIO QRO1 y QRO2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.7 km away.
How clean is the power for Centro de datos KIO QRO1 y QRO2?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Who operates Centro de datos KIO QRO1 y QRO2?
KIO.
Data centers near Saldarriaga
- KIO Querétaro 1 (QRO1) 320 m
- EdgeUno Datacenter Queretaro Mexico (QRO3) 321 m
- Equinix MX1/MX2 - Mexico City 2.4 km · 2.6 MW
- Centro de datos Bleeding Edge QRO1 3.5 km · 0.8 MW
- Centro de datos ODATA QR03 4.1 km · 17 MW
- Bleeding Edge QRO1 4.2 km
- Amazon AWS Querétaro 6.4 km · 7 MW
- Centro de datos ODATA QR01 6.4 km · 3.3 MW
More KIO data centers
- Centro de datos KIO MEX5 Mexico
- Centro de datos KIO MEX6 Mexico
- KIO México 4 (MEX4) Mexico
- Centro de datos KIO MEX2 Mexico
- KIO Hermosillo 1 (HER1) Mexico
- KIO Mérida 1 (MER1) Mexico
- KIO Mérida 2 (MER2) Mexico
- KIO México 2 (MEX2) Mexico
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.