Centro de datos Bleeding Edge QRO1
Centro de datos Bleeding Edge QRO1 is an operational data center operated by Bleeding Edge in La Cañada, Mexico. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bleeding Edge |
| Facility power | 0.8 MW (range 0.3 MW to 2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,818 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 20.53504, -100.25100 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 400 kV, 1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 13 |
| Power plants within 50 km | 700 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Average temperature | 17.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.2 °C (2001 to 2025) |
| Cooling degree days | 416 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.89 kWh per m² per day |
| Wind at 50 m | 4.7 m/s average |
| Water stress today | High (40-80%) (Mexico) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de datos Bleeding Edge QRO1 use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
How close is Centro de datos Bleeding Edge QRO1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (400 kV), about 1 km away.
How clean is the power for Centro de datos Bleeding Edge QRO1?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Who operates Centro de datos Bleeding Edge QRO1?
Bleeding Edge.
Data centers near La Cañada
- Bleeding Edge QRO1 775 m
- Centro de datos ODATA QR03 1.5 km · 17 MW
- EdgeUno Datacenter Queretaro Mexico (QRO3) 3.3 km
- Centro de datos KIO QRO1 y QRO2 3.5 km · 3.4 MW
- KIO Querétaro 1 (QRO1) 3.7 km
- Equinix MX1/MX2 - Mexico City 3.7 km · 2.6 MW
- Amazon AWS Querétaro 7.8 km · 7 MW
- Centro de datos ODATA QR01 8.0 km · 3.3 MW
More Bleeding Edge data centers
- Bleeding Edge QRO1 Mexico
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.