Bleeding Edge QRO1
Bleeding Edge QRO1 is an operational data center operated by Bleeding Edge in El Marqués, Mexico. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Bleeding Edge |
| Networks | 1 networks PeeringDB. |
| Address | Parque Industrial PYME, Lote industrial 4 de la manzana 3 Primera Etapa Fraccionamiento |
| Coordinates | 20.53055, -100.24532 |
| Website | bleedingedge.group |
Power and grid
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Water stress today | High (40-80%) (Mexico) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Bleeding Edge QRO1?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Who operates Bleeding Edge QRO1?
Bleeding Edge.
Data centers near El Marqués
- Centro de datos Bleeding Edge QRO1 775 m · 0.8 MW
- Centro de datos ODATA QR03 1.0 km · 17 MW
- EdgeUno Datacenter Queretaro Mexico (QRO3) 3.9 km
- Centro de datos KIO QRO1 y QRO2 4.2 km · 3.4 MW
- KIO Querétaro 1 (QRO1) 4.3 km
- Equinix MX1/MX2 - Mexico City 4.5 km · 2.6 MW
- Amazon AWS Querétaro 7.8 km · 7 MW
- Centro de datos ODATA QR01 8.0 km · 3.3 MW
More Bleeding Edge data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.