Data Center Directory

Amazon AWS Querétaro

Amazon AWS Querétaro is an operational data center operated by Amazon Web Services in Pedro Escobedo, Mexico. Our footprint estimate of its power is about 7 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusOperational
OperatorAmazon Web Services
Facility power7 MW (range 2.8 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 58,629 m² site outline x 0.12 kW per m² of land.
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 3,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates20.58602, -100.19912

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 100 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 400 kV, 8.7 km away
HV substations within 10 km17
Power plants within 50 km700 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity481 g CO₂ per kWh (Mexico, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2%

Climate and water

Average temperature16.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.4 °C (2001 to 2025)
Cooling degree days252 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.62 kWh per m² per day
Wind at 50 m4.8 m/s average
Water stress todayHigh (40-80%) (Mexico)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Amazon AWS Querétaro use?

We estimate the facility power at about 7 MW. Estimate from building footprint, low confidence.

What chips does Amazon AWS Querétaro use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

How close is Amazon AWS Querétaro to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 100 m away.

How clean is the power for Amazon AWS Querétaro?

The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.

Who operates Amazon AWS Querétaro?

Amazon Web Services.

Data centers near Pedro Escobedo

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.